Invitation to Tender

ITT - PS20191601 - CONSTRUCTION SERVICES FOR 2020 STORMWATER, LEACHATE, AND GAS SYSTEMS EXPANSION - VANCOUVER LANDFILL

LAST UPDATED:

 

Addendum

No updates

Amendment

December 11, 2019

Questions & Answers

December 13, 2019

CONTACT

All queries related to this ITT should be submitted in writing to the attention of:

Brian Brennan, Contracting Specialist

Email: brian.brennan@vancouver.ca

PHONE NUMBER

604.871.6946

FAX NUMBER

604.873.7057

ENQUIRIES

brian.brennan@vancouver.ca

[Please specify bid number, bid title and purchasing agent's name when sending email.]

Questions will be accepted, and answers posted, ONLY IF they are submitted in writing five working days prior to the bid closing date

CLOSING DATE & TIME

3:00:00 pm (Local Vancouver Time), Tuesday, December 17, 2019

CLOSING LOCATION

Mailing Address:
City of Vancouver, Purchasing Services
453 West 12th Avenue
Vancouver, BC Canada V5Y 1V4

Envelopes submitted by courier or otherwise in-person should be delivered to:
Supply Chain Management
453 West 12th Avenue - 4th Floor - Bid Submission Box
Vancouver City Hall
Vancouver, British Columbia

Tenders received after the closing time may be returned unopened.

Faxed tenders will not be accepted.

Please visit our Bidding Procedures page for additional information.

General Description of Requirement

The City of Vancouver (the “City”) invites Tenders for the construction of stormwater, leachate, and gas systems expansion at the Vancouver Landfill.

The purpose of this ITT is to select a Tenderer with the capability and experience to efficiently
and cost-effectively perform and complete the Work.

The Work generally includes, but is not limited to:

- Construction of Phase 4 North Lift 4 Horizontal Gas Collectors;

- Construction of Phase 5 Culvert Extension;

- Construction of Phase 5 South Lift 1 Leachate Collector; and

- Construction of Phase 4 North Gas Sub-Header Conveyance Pipe (Provisional Item).

The Work Site is located at 5400 72nd Street, Delta, British Columbia. The Work Site is further described in the Tender Documents.

[top]

Information Meeting

Tenderers are required to attend the mandatory information meeting (the “Mandatory Information Meeting”) on Thursday, November 28, 2019 commencing at 1:00 p.m.

The Mandatory Information Meeting will take place at the Landfill.

All persons attending the Mandatory Information Meeting on behalf of Tenderers must bring their own personal protective equipment (PPE) consisting of steel toe footwear, high visibility vests, and safety glasses.

Tenderers are asked to pre-register for the Mandatory Information Meeting by submitting the Mandatory Information Meeting Attendance Form (Appendix 1) to the Contact Person by email prior to Tuesday, November 26, 2019 at 3:00 p.m.

[top]

Downloading the Document

Bidders must not electronically alter any portion of downloaded documents with the exception of adding the information requested. To do so will invalidate your bid.

Download

Description

PS20191601 PDF 3434 KB

 

CONSTRUCTION SERVICES FOR 2020 STORMWATER, LEACHATE, AND GAS SYSTEMS EXPANSION - VANCOUVER LANDFILL

[top]

Amendment

Amendment No. 1 PDF 90 KB

 

 

 

Amendment No. 2 PDF 51 KB

 

Amendment No. 3 PDF 96 KB

 

 

 

 

 

 

 

 

RE: CHANGES TO DRAWINGS - PART D – FORM OF AGREEMENT – SCHEDULE 2 – SPECIFICATIONS AND DRAWINGS – IFT DRAWINGS REV.1; RE: CHANGE TO SPECIFICATIONS – PART D – FORM OF AGREEMENT – SCHEDULE 2 – SPECIFICATIONS AND DRAWINGS – SPECIFICATIONS - SECTION 01 20 00 MEASUREMENT AND PAYMENT – SECTION 1.06 DESCRIPTION OF PAYMENT ITEMS.

RE: CHANGES TO PART C – FORM OF TENDER – SCHEDULE “A” SCHEDULE OF QUANTITIES AND PRICES.

RE: CHANGES TO DRAWINGS - PART D – FORM OF AGREEMENT – SCHEDULE 2 – SPECIFICATIONS AND DRAWINGS; RE:CHANGES TO SCHEDULE OF QUANTITIES AND PRICES - PART C – FORM OF TENDER – SCHEDULE “A”; RE: CHANGE TO SPECIFICATIONS – PART D – FORM OF AGREEMENT – SCHEDULE 2 – SPECIFICATIONS AND DRAWINGS – SPECIFICATIONS - SECTION 00 73 19 SITE HEALTH AND SAFETY REQUIREMENTS – SECTION 1.06 CONTRACTOR’S SITE HEALTH AND SAFETY OFFICER; RE: CHANGE TO SPECIFICATIONS – PART D – FORM OF AGREEMENT – SCHEDULE 2 – SPECIFICATIONS AND DRAWINGS – SPECIFICATIONS - SECTION 01 20 00 MEASUREMENT AND PAYMENT – SECTION 1.06 DESCRIPTION OF PAYMENT ITEMS; RE: CHANGE TO SPECIFICATIONS – PART D – FORM OF AGREEMENT – SCHEDULE 2 – SPECIFICATIONS AND DRAWINGS – SPECIFICATIONS - SECTION 01 20 00 MEASUREMENT AND PAYMENT – SECTION 1.06 DESCRIPTION OF PAYMENT ITEMS.

[top]

Addendum

No addendum at this time.

[top]

Questions and Answers

Q&A No. 1 PDF 20 KB

Q&A No. 2 PDF 31 KB

Q&A No. 3 PDF 50 KB

Q&A No. 4 PDF 46 KB

ISSUED NOVEMBER 27, 2019

ISSUED DECEMBER 6, 2019

ISSUED DECEMBER 11, 2019

ISSUED DECEMBER 13, 2019

[top]