Invitation to Tender

ITT PS20191496 - CONSTRUCTION SERVICES FOR PHASE 4 CLOSURE AND GAS SYSTEM UPGRADES - VANCOUVER LANDFILL

LAST UPDATED:

 

Addendum

No updates

Amendment

December 23, 2019

Questions & Answers

January 13, 2020

CONTACT

All queries related to the ITT should be submitted in writing to the attention of:

Brian Brennan, Contracting Specialist

Email: brian.brennan@vancouver.ca

PHONE NUMBER

604.871.6946

FAX NUMBER

604.873.7057

ENQUIRIES

brian.brennan@vancouver.ca

[Please specify bid number, bid title and purchasing agent's name when sending email.]

Questions will be accepted, and answers posted, ONLY IF they are submitted in writing five working days prior to the bid closing date

CLOSING DATE & TIME

3:00:00 pm (Local Vancouver Time), Thursday, January 30, 2020  

CLOSING LOCATION

Mailing Address:
City of Vancouver, Purchasing Services
453 West 12th Avenue
Vancouver, BC Canada V5Y 1V4

Envelopes submitted by courier or otherwise in-person should be delivered to:
Supply Chain Management
453 West 12th Avenue - 4th Floor - Bid Submission Box
Vancouver City Hall
Vancouver, British Columbia

DO NOT SUBMIT TENDERS BY FAX OR E-MAIL.

Tenders received after the closing time may be returned unopened.

Faxed tenders will not be accepted.

Please visit our Bidding Procedures page for additional information.

General Description of Requirement

The City of Vancouver (the “City”) invites tenders from qualified construction contractors for certain landfill closure and landfill gas system upgrades work (the “Work”) at the City’s landfill facility located at 5400-72nd Street in Delta, British Columbia (the “Landfill”). The project is known as the Phase 4 Closure and Gas System Upgrades, Vancouver Landfill. The objective of the ITT is the selection of a Tenderer with the capability and experience to efficiently and cost-effectively perform and complete the Work.

The Specifications and Drawings are incorporated herein by reference and will be available for Tenderers at the following FTP site:
https://webtransfer.vancouver.ca
The user ID is: 93700dl@coveftp01
The password is: KsGsJ6vdv (The password is case sensitive.)

The Specifications and Drawings include the “Master Municipal Specifications and Standard Detail Drawings” contained within Volume II of the Master Municipal Construction Document, except that all of Volume I and the following parts of Volume II thereof are hereby expressly excluded from the Specifications and Drawings and from ITT: Instructions to Tenderers – Part II. General Conditions (including Schedule 17.5.3 Letter Agreement with Referee, Changes and Extra Work flow chart, and Dispute Resolution Process flow chart).

[top]

Information Meeting

MANDATORY INFORMATION MEETING

Tenderers are required to attend the mandatory information meeting (the “Mandatory Information Meeting”) on Tuesday, January 14, 2020 commencing at 10:00 a.m.

The Mandatory Information Meeting will take place at the Landfill.

All persons attending the Mandatory Information Meeting on behalf of Tenderers must bring their own personal protective equipment (PPE) consisting of steel toe footwear, high visibility vests, and safety glasses.

Tenderers are asked to pre-register for the Mandatory Information Meeting by submitting the Mandatory Information Meeting Attendance Form (Appendix 1) to the Contact Person by email prior to Monday, January 13, 2020 at 3:00 p.m.

ADMINISTRATIVE REQUIREMENTS

Tenderers are asked to indicate their intentions to submit Tenders by submitting the Response Notification Form (Appendix 2) to the Contact Person by email on or before Thursday, January 23, 2020.

[top]

Downloading the Document

Bidders must not electronically alter any portion of downloaded documents with the exception of adding the information requested. To do so will invalidate your bid.

Download

Description

PS20191496PDF 3,545 KB

 

CONSTRUCTION SERVICES FOR PHASE 4 CLOSURE AND GAS SYSTEM UPGRADES - VANCOUVER LANDFILL

[top]

Amendment

Amendment 1 PDF 154 KB

 


1. RE: PART D – FORM OF AGREEMENT – SCHEDULE 2 – SPECIFICATIONS AND DRAWINGS - CHANGES TO DRAWINGS - Rev F – Issued for Addendum #1

2. RE: PART D – FORM OF AGREEMENT – SCHEDULE 2 – SPECIFICATIONS AND DRAWINGS - CHANGE TO SPECIFICATIONS - SECTION 01 11 00 SUMMARY OF WORK

[top]

Addendum

No addendum at this time.

[top]

Questions and Answers

Q&A 1 PDF 21 KB

Q&A 2 PDF 21 KB

ISSUED JANUARY 8, 2020

ISSUED JANUARY 13, 2020