Invitation to Tender
ITT PS20172554 - PHASE 3 NE CLOSURE AND PHASE 4 LFG SYSTEM EXPANSION – VANCOUVER LANDFILL
LAST UPDATED:
Addendum
No updates
Amendment
April 13, 2018
Questions & Answers
April 13, 2018
CONTACT
All queries related to the ITT should be submitted in writing to the attention of:
Brian Brennan, Contracting Specialist
Email: brian.brennan@vancouver.ca
PHONE NUMBER
604.871.6946
FAX NUMBER
604.873.7057
ENQUIRIES
[Please specify bid number, bid title and purchasing agent's name when sending email.]
Questions will be accepted, and answers posted, ONLY IF they are submitted in writing five working days prior to the bid closing date
CLOSING DATE & TIME
3:00:00 pm (Local Vancouver Time), Tuesday, April 17, 2018
CLOSING LOCATION
Mailing Address:
City of Vancouver, Purchasing Services
453 West 12th Avenue
Vancouver, BC Canada V5Y 1V4
Envelopes submitted by courier or otherwise in-person should be delivered to:
Supply Chain Management
453 West 12th Avenue - 4th Floor - (Bid Submission Box)
Vancouver City Hall
Vancouver, British Columbia
Tenders received after the closing time may be returned unopened.
Faxed tenders will not be accepted.
Please visit our Bidding Procedures page for additional information.
General Description of Requirement
The purpose of the ITT is to invite tenders from qualified construction contractors for
performance of the Work as required hereunder for the construction of landfill closure and gas
works in Phase 3 Northeast and Phase 4 closure areas of the City of Vancouver’s landfill located
at 5400 72nd Street, Delta British Columbia (the “Landfill”). As indicated, the Work consists of
two Landfill projects, one of which is the Phase 3 NE Closure and Gas Works project and the
other the Phase 4 LFG System Expansion Works project. Each Project will have its own Work
schedule due to the unique timelines required for completion of each. The ultimate objective
of the ITT is the selection of one Tenderer with the capability and experience to efficiently and
cost-effectively perform and complete all of the Work.
[top]
Information Meeting
MANDATORY INFORMATION MEETING
Tenderers are required to attend the mandatory information meeting (the “Mandatory
Information Meeting”) on Wednesday, March 21, 2018 commencing at 10:00 a.m.
The Mandatory Information Meeting will take place at the Landfill.
All persons attending the Mandatory Information Meeting on behalf of Tenderers must bring
their own personal protective equipment (PPE) consisting of steel toe footwear, high visibility
vests, and safety glasses.
Tenderers are asked to pre-register for the Mandatory Information Meeting by submitting the
Mandatory Information Meeting Attendance Form (Appendix 1) to the Contact Person by email
prior to Friday, March 16, 2018 at 3:00 p.m.
ADMINISTRATIVE REQUIREMENTS
Tenderers are asked to indicate their intentions to submit Tenders by submitting the Response
Notification Form (Appendix 2) to the Contact Person by email on or before Tuesday, April 10,
2018.
[top]
Downloading the Document
Bidders must not electronically alter any portion of downloaded documents with the exception of adding the information requested. To do so will invalidate your bid.
Download
Description
PHASE 3 NE CLOSURE AND PHASE 4 LFG SYSTEM EXPANSION – VANCOUVER LANDFILL
NOTE: The listed Specifications and Drawings are not included herewith but may be accessed by potential Tenderers at the ftp site:
https://webtransfer.vancouver.ca
The user ID is: PS20172254DL@coveftp01
The password is: xnS4D9Fj (The password is case sensitive.)
[top]
Amendment
1. RE: CHANGES TO DRAWINGS - PART D – FORM OF AGREEMENT – SCHEDULE 2 –
SPECIFICATIONS AND DRAWINGS – DRAWINGS - PHASE 4 LIFT 2 HORIZONTALS
ADDENDUM; 2. RE: CHANGE TO SPECIFICATIONS – PART D – FORM OF AGREEMENT – SCHEDULE 2 – SPECIFICATIONS AND DRAWINGS – SECTION 01 11 00 SUMMARY OF WORK – SECTION
1.05 WORK SEQUENCE; 3. RE: CHANGE TO SPECIFICATIONS – PART D – FORM OF AGREEMENT – SCHEDULE 2 – SPECIFICATIONS AND DRAWINGS – SPECIFICATIONS - SECTION 01 20 00 MEASUREMENT
AND PAYMENT – SECTION 1.06 DESCRIPTION OF PAYMENT ITEMS; 4. RE: CHANGE TO PART C – FORM OF TENDER – SCHEDULE “A” – SCHEDULE OF
QUANTITIES AND PRICES.
1. RE: ADDITIONAL SPECIFICATION: PART D – FORM OF AGREEMENT – SCHEDULE 2 –
SPECIFICATIONS AND DRAWINGS; 2. RE: CHANGE TO LIST OF SPECIFICATIONS AND DRAWINGS: PART D – FORM OF
AGREEMENT – SCHEDULE 2 – SPECIFICATIONS AND DRAWINGS.
1. CHANGE TO SPECIFICATIONS: PART D – FORM OF AGREEMENT – SCHEDULE 2 –
SPECIFICATIONS – SECTION 01 20 00 MEASUREMENT AND PAYMENT – ITEM 2.04
LOADING, HAULING, PLACEMENT AND COMPACTION OF CONTRACTOR SUPPLIED
GRADING FILL; 2. CHANGE TO SPECIFICATIONS: PART D – FORM OF AGREEMENT – SCHEDULE 2 -
SPECIFICATIONS – SECTION 01 11 00 SUMMARY OF WORK - 1.05 WORK SEQUENCE
1. CHANGE/CLARIFICATION TO SPECIFICATIONS: PART D – FORM OF AGREEMENT –
SCHEDULE 2 – SPECIFICATIONS – SECTION 01 20 00 MEASUREMENT AND PAYMENT
[top]
Addendum
No addendum at this time.
[top]
Questions and Answers
[top]